Key Highlights
- 208 hand-auger drill holes completed with an average depth of 8.5m
- Priority drilling at Mkanda due to the close proximity to rail ~11km
- Soil assays expected late Nov 2025
- First hand-auger assay results due mid-Dec 2025
- XRD & QEMSCAN mineralogy analysis underway, results expected late Q4 2025
- Projects are located ~20km south of Sovereign Metals Limited (ASX: SVM) the world-class Kasiya rutile and graphite deposit.
Link to the Announcement: Click Here
