Brightstar Resources (ASX: BTR) has recommenced drilling at the Yunndaga deposit, Menzies Hub
Key Highlights:

  • Brightstar has started Phase 2 drilling at the Yunndaga deposit (3.4Mt @ 1.4g/t Au for 156koz) within the 0.6Moz @ 1.4g/t Au Menzies Hub.
  • The program includes 5,000m of RC and 2,500m of diamond drilling, targeting extensions and infill.
  • Historically produced ~270koz @ >16g/t (1896–1943) and ~64koz @ 2.5g/t (1990s).
  • A recent DFS outlined an underground plan recovering ~50koz from 0.6Mt @ 2.6g/t. Phase 1 drilling returned 16m @ 8.03g/t Au confirming high-grade potential.

Link to the Announcement: Click Here