PhosCo (ASX: $PHO) – Major Breakthrough at Gasaat Phosphate Project PhosCo has released a strong update from its 100%-owned Gasaat Project in Tunisia, with early drilling at the KM Prospect pointing to a fast-track development opportunity.
KM Prospect – A Potential Catalyst for Early Production
- Thick, shallow phosphate intercepts: Up to 34.6m from 24m depth
- Located beside the proposed plant site, reducing mining and haulage costs
- Low-strip geometry supports rapid, low-cost production
- Ongoing drilling underway with assays due this quarter
- Management: KM could be a “game-changer” for early cash flow
GS Prospect
- 15m phosphate hit at 160m depth
- Linked to the nearby GK deposit, expanding exploration upside
SAB Prospect
- Topographic survey complete
- Maiden Mineral Resource Estimate expected this quarter
Sekarna Permit
- PhosCo is working with authorities to secure access to key targets overlapping a proposed nature reserve
Gasaat is shaping up as a scalable, low-cost project with near-term development potential.
Link to the Announcement: Click Here