Key Highlights
- High-grade rutile intersected from surface to 10m, with most holes open at depth, along strike and laterally
- Strong results include 10m @ 1.62% rutile, 9m @ 1.30% rutile, and multiple intervals exceeding 1% rutile from surface
- Large-scale system emerging with 675 hand auger drillholes completed at an average depth of ~8m
- Only 45 assays received, with a further 630 results expected progressively through Q1 2026
- Reviewing rare earth monazite and zircon potential, following Sovereign heavy rare earth discovery at Kasiya
- Graphite analysis underway to support a dual commodity strategy and enhance RutEq economics
- In-country lab commissioning in Lilongwe in early 2026 to accelerate assay turn around times
- Management in Malawi ahead of the 121 Conference (Cape Town), engaging with existing and new investors
Link to the Announcement: Click Here
