Key Highlights
- Peak rutile assays of up to 2.21% returned from shallow hand-auger drilling at Mkanda
- Multiple strong intercepts from surface to 10m, including 10m @ 1.66% rutile and 10m @ 1.32% rutile, all ending in mineralisation and open at depth
- 544 drill holes completed to date, demonstrating widespread high-grade rutile across the project area
- Results indicate strong potential for large-scale rutile mineralisation, with consistent assays expected through Q1 2026
- Parallel graphite analysis underway, supporting a dual-commodity development strategy
- In-country Heavy Liquid Separation (HLS) laboratory planned for 2026 to accelerate assay turnaround times.
Link to the Announcement: Click Here
