Key Highlights

  • 2025 airborne EM interpretation defines a new ~20km × 5km corridor across expanded Reitenbach Lake tenements.
  • Elevated uranium anomalism confirmed across Reynolds & Reitenbach Lake, incl. 1.90% U₃O₈ at the Titus Showing
  • Strongly aligned with regional EM conductors and major structural features
  • Integrated structural, geophysical & geochemical work underway to finalise drill targets by Q1 CY2026
  • Results strengthen scale and continuity ahead of maiden drilling in Q2 CY2026

Link to the Announcement: Click Here